1997 Dassault Falcon 50EX For Sale In USA (PS-JSR)
This aircraft features Honeywell TFE731-40-1C engines enrolled in MSP Gold, a Garrett GTCP-36-100A APU enrolled in MSP Gold, an eight passenger executive interior with new soft goods installed in March 2021 and a 2C inspection and landing gear overhaul due in 2033.
Description
Airframe
8202 Total Hours as of January 2026
5686 Landings
Engines
Honeywell TFE731-40-1C enrolled in MSP Gold
Engine #1: 8029.4 Total Hours, 5624 Cycles Since New
Engine #2: 8029.4 Total Hours, 5624 Cycles Since New
Engine #3: 7902.7 Total Hours, 5553 Cycles Since New
Garrett GTCP-36-100A APU enrolled in MSP Gold
3596.3 Total Hours
Avionics
Dual Collins ADC-850F Air Data, Dual Collins ADF-462, Collins AHS-85, Dual Baker Audio Panels, Collins APS-4000 Digital Autopilot, Allied Signal SSCVR Cockpit Voice Recorder, Dual Collins VHF-422C with 8.33 Spacing, Dual Collins DME-422, Four Collins Flight Displays, Honeywell Mark V EGPW w/ Windshear, Dual Honeywell FMZ-2000 w/ GPS, Dual Allied Signal KHF-950 Comms w/Selcal, Dual Honeywell Laseref III, Dual Collins VIR-432 Navs w/FM Immunity, Collins TWR-850 Weather Radar w/Second Radar Control, Collins ALT-55B, Dual Collins Radio Tuning Units 4020, Honeywell Aero H Triple Channel SATCOM Flight Phone, Collins TCAS-94 TCAS II w / Change 7, Dual Collins TDR-94D Transponders ADS-B Out
Additional Equipment
Precise Flight Pulselite Landing Light System, DeVore Tell-Tail Lights, Securaplane 450 Security system
Interior
New Soft Goods March 2021, Eight (8) Passenger Executive Interior with Forward and Aft Club Seating, Avion Blonde Leather with Avion Wicker Inserts from Garrett Leather, Slate Classic 21 Dark Suede Carpeting, High Gloss Pecan Cabinetry, Airshow Genesys System w/Cabin/Cockpit Monitors, Forward Galley, Aft Lav with Vanity, ATG 2000 Gogo Biz Wifi
Exterior
Paint 2009, White with Emerald Green and Sunburst Yellow Accents
Maintenance
12 Month Inspection complied with April 2025, Next Due April 2026
24 Month Inspection complied with April 2025, Next Due April 2027
1B (1500 Hrs) complied with March 2021/7657 Hrs, 955 Hrs remaining
2B (3000 Hrs) complied with March 2021/7657 Hrs, 2455 Hrs remaining
3B (4500 Hrs) complied with March 2021/7657 Hrs, 3955 Hrs remaining
4B (6000 Hrs) complied with March 2011/5527 Hrs, 2455 Hrs remaining
1C (72 Months) complied with March 2021, Next Due March 2027
2C (144 Months) complied with March 2021, Next Due March 2033
Landing Gear Overhaul complied with March 2021, Next Due March 2033
AD 2013-09-03 Dry Bay Mod completed July 2024 (Duncan Av)
No Known Damage History or Major Corrosion Repairs
Complete Logs and Records
CAMP Maintenance Tracking











