2005 Bombardier Challenger 300 For Sale In North Carolina USA (N1870G)
This aircraft is enrolled on Smart Parts Plus with the engines on Honeywell MSP and the APU on MSP Gold. It features Collins Pro Line 21 Advanced avionics with FANS 1/A and Synthetic Vision, Gogo Avance L5 connectivity and a ten-seat cabin with a forward galley and aft executive lavatory. The carpet and divan covering were renewed in 2019 and the aircraft was painted the same year.
Description
Airframe
Total Hours: 5,557 (as of August 2026)
Total Landings: 2,888
Certification Date: January 2005
Entry Into Service: April 2005
Operation: FAA Part 91
Maintenance Tracking: Veryon
Parts Maintenance Program: Smart Parts Plus
Engines
Engine Program: Honeywell MSP
Engine 1
Make/Model: HONEYWELL HTF7350 (AS907-2-1A)
Serial Number: P118367
Total Hours Since New: 16,337.8
Cycles Since New: 9,978
Engine 2
Make/Model: HONEYWELL HTF7350 (AS907-2-1A)
Serial Number: P118469
Total Hours Since New: 17,337.0
Cycles Since New: 10,644
APU
Make/Model: Honeywell GTCP36-150(BD)
Serial Number: P-119
APU Total Time: 3,053
APU Program: Honeywell MSP Gold
Avionics
Flight Deck Manufacturer/Model: Collins
Collins Pro Line 21 Advanced Avionics, Four Collins AFD-5220, Dual Collins FMC-6200, Dual Collins GPS-4000S, Dual Collins ADC-3000, Dual Collins NAV-4000, Triple Collins VHF-4000, Dual Collins HF-9000 w/ SELCAL, Collins RTA-4114, Collins ALT-4000, Collins TDR-94D, Collins TTR-4000, L3 Communications CVR, L3 Communications FDR, Artex C406-N ELT, FANS 1/A, Synthetic Vision System
Additional Equipment
Wifi: Yes (Gogo Avance L5), FANS 1/A, Synthetic Vision System
Interior
Year Interior: 2019 (New Carpet and Divan Covering)
Number of Seats: 10
Galley: Yes
Galley Configuration: Forward
Lavatory: Yes
Lavatory Configuration: Aft Executive
Forward Cabin: Four-Place Executive Club
Aft Cabin: Three-Place Divan Opposite Two-Place Club
Internet: Gogo Avance L5
Display Monitors: Forward and Aft Cabin Bulkhead
Exterior
Year Painted: 2019
Base: White
Stripes: Grey and Red
Maintenance
12-Month: Last Completed 04/2026, Next Due 04/2027
24-Month: Last Completed 03/2025, Next Due 03/2027
48-Month: Last Completed 03/2025, Next Due 03/2029
96-Month: Last Completed 03/2021, Next Due 03/2029
192-Month: Last Completed 03/2021, Next Due 03/2037


















